Solar Panel Installation
Module layout planning based on shadow analysis, string design, orientation, and site constraints for better generation consistency.
We execute each subsystem carefully so the final plant is safe, maintainable, and performance-oriented.
Module layout planning based on shadow analysis, string design, orientation, and site constraints for better generation consistency.
GI or aluminum structure installation with proper alignment, fastening torque checks, and wind-load conscious arrangement.
UV-resistant DC cable routing, AC output cabling, dressing, ferruling, and labeling for clean troubleshooting and maintenance.
Inverter mounting, DC string termination, AC output integration, communication setup, and startup verification.
Protection arrangement using appropriate isolators, SPD, MCB/MCCB selection, and interconnection quality checks.
Dedicated earthing network for modules, structure, inverter, and SPDs along with lightning arrester positioning and bonding.
We source dependable equipment from trusted manufacturers. Final selection is aligned to project specs and availability.
Tata
Adani
Waree
Luminous
Selec
Luminous
Feston
Growatt
Schneider
ABB
Havells
Galvanized iron structures as per site design.
Copper-based earthing and lightning arrestor material.
Polycab
Havells
A practical sequence followed for safer and more predictable execution.
Move the slider to match your monthly electricity consumption. Estimates use 100–125 units of generation per kW per month.
1 kW typically generates 3.5–4.2 units daily, 100–125 units monthly, and 1,200–1,500 units annually.
Enter your monthly usage and select "Calculate Required kW" to see your result.
Choose an approximate size according to available area and expected energy generation. Figures are indicative and vary by season and site conditions.
Simple estimators for initial financial planning. Actual values depend on tariff, policy, and financing terms.
Yes. Scope can include structure, wiring, inverters, ACDB/DCDB, earthing, and lightning arrester integration.
Yes. Post-installation checks and operational guidance are available based on project scope.